打卡热点:Saloma Link彩色行人天桥
这座造价RM3100万的Saloma Link行人天桥,不仅是推动Kampung Baru现代化进程的项目之一,也是吉隆坡市中心最新的地标。
这座造价RM3100万的Saloma Link行人天桥,不仅是推动Kampung Baru现代化进程的项目之一,也是吉隆坡市中心最新的地标。
PPK Malaysia suggested that mall operators may consider allowing tenants to operate shorter business hours – either mall wide or only for some tenants, as part of measures to reduce operating cost…
From bare concrete and dilapidated conditions, the sports courts of these PPRs were transformed into multipurpose ones…
Ceramic tiles must adhere to the MS ISO 13006:2014 standard. This standard is regulated by the Construction Industry Development Board (CIDB) Malaysia as stipulated under Schedule 4 of CIDB Act 520.
Tiles can also be made from materials such as granite, marble, limestone and glass. Thus, choosing the right floor tile can be intimidating and challenging.
Each area has its own merits but most of them are long established and matured neighbourhoods with mainly landed homes.
The iconic RM31 million Link footbridge, one of several projects under the modernisation plan of Kampung Baru, was opened to the public yesterday.
Sold for: RM3,500,000 (RM681.73 psf); When: November 2019; Concluded by: Ethan See (REN 22527, 017-673 3650) of Affirm Plus Properties Sdn Bhd