Suria Residence, Warisan Suria

SELANGOR: Warisan Residence 1 Phase 1C, the latest phase of double-storey terraced homes located in the township of Suria Warisan, has seen a take-up rate of 50% since its launch on Dec 4.

Suria Warisan is a 37.23 hectare township with a gross development value (GDV) of RM850 million located in Salak Tinggi, Sepang, and developed by Hectare Heights Development Sdn Bhd.

Phase 1C consists of 44 units, while Phase 1A and 1B consist of 47 and 42 units, respectively.

Prices for Phase 1C start at RM485,800 upwards. The units in Phase 1C have a built-up area of 2,140 sq ft.

The GDV of Phase 1C is RM22.3 million while the GDV of the entire Phase 1 is RM60 million.

“Phase 1A has been fully sold while Phase 1B has fully sold. The total take-up rate of the entire Phase 1 is 75%,” said director Yap Kok Guan.

Phase 1A, 1B and 1C are expected for completion by early 2018.

Meanwhile, Yap plans to build affordable homes in the township.

“At least half of our landed properties will be priced below RM 550,000,” he said.

Public amenities nearby include the Salak Tinggi ERL station (2km away), and educational institutions such as Xiamen University (2km) and INTI International University (5km). Kuala Lumpur International Airport (KLIA) and Kuala Lumpur International Airport 2 (KLIA 2) are 7km away.

“We are also well connected by the many major highways leading into the township. We are only 10-15 minutes away from the Elite, North-South Expressway, and Maju Expressway which links the township to areas such as Bangi, Kajang, Puchong South and Dengkil,” Yap said.

So far, 15% of the 92-acre Suria Warisan township has been developed. Yap said there will be three phases of residential components and two plots of land allocated for commercial property in the township.

“Phase 2 of the residential component will consist of 244 units of 2 and 3-storey terraced homes with a built-up area of approximately 2,400 sq ft. We [plan] to launch Phase 2A (47 units) and Phase 2B (48 units) in the first half of next year,” Yap added.

(Amended at 5:38pm to update the take-up rates of the different phases, and insert the correct percentage of acreage so far developed.)
SHARE
RELATED POSTS
  1. Talam Transform to dispose of Sepang land to IJM as part of debt settlement
  2. IOI Properties breaks ground for 117-acre Senna Puteri in Sepang
  3. MGB bags RM207.03 mil property development project in Sepang