ECRL reaches 88% progress with completion of C1B Segment
Construction of the C1B Segment began in September 2022, covering a technically significant stretch between the Genting Tunnel exit and the Gombak Integrated Terminal Station.
Construction of the C1B Segment began in September 2022, covering a technically significant stretch between the Genting Tunnel exit and the Gombak Integrated Terminal Station.
D'Pulze Residence, Selangor serviced residence sold for RM280k | DONE DEAL USJ Sentral, Selangor shop sold for RM2.
REHDA stated that Minister of Housing and Local Government Nga Kor Ming clearly signified the “government’s willingness and readiness to focus on the rakyat’s needs and to take all industry stakeholders’ opinions into consideration, to ensure the property industry remains robust and healthy”.
The upgrading works will introduce a “modern facade” and increase floor area by 4% to 568,927 sq ft, set to house over 300 retailers.
The projects are part of the Austin Duta township in Johor Bahru’s northern corridor, a 250-acre freehold development launched in 2015.
The new entity currently has nine ongoing residential developments in Singapore, comprising 4,937 units with an attributable gross development value (GDV) of S$4.
OFFLINE 16 aims to raise awareness by making preventive mental wellness simple, practical, and accessible through real-world experiences that encourage people to unplug, reconnect, and build healthy habits.
This marks the first time a developer-led township has received Platinum recognition in a programme traditionally reserved for local councils and government agencies.
The disposal will pave the way for M Legasi 2—an integrated township envisioned as an upscale extension of the current M Legasi development.
MAHB said it has received data and assurance from the contractors about the train, but "the information provided has not instilled sufficient confidence in the current reliability of the aerotrain system".